|
Usage, resolution, format,
size in pixels and cm ![]() Single item
purchase
10 downloads /
subscription 500
Within
40 credits S
Internet, 72 dpi, JPG
500 x 333, 18x12 cm €6
€2.9 / €0.6
€1.90
2 credits
M
Internet, 72 dpi, JPG
1000 x 667, 35x24 cm €8
€2.9 / €0.6
€2.85
3 credits
L
Mini print, 300 dpi, JPG
2000 x 1333, 17x11 cm €13
€7.0 / €0.6
€5.70
6 credits
XL
Print, 300 dpi, JPG
5377 x 3584, 46x30 cm €15
€7.0 / €0.6
€9.50
10 credits
Details of the item PHX836415998:
Content title:
Bucharest, Romania. 28th Aug, 2025: Sector 4 Mayor Daniel Baluta speaks during a press conference about the reconstruction work on the concrete slab covering the Dambovita River in Unirii Square. Severely degraded, the 350-meter concrete slab partlyContent description: Bucharest, Romania. 28th Aug, 2025: Sector 4 Mayor Daniel Baluta speaks during a press conference about the reconstruction work on the concrete slab covering the Dambovita River in Unirii Square. Severely degraded, the 350-meter concrete slab partlyContent author: llcv© llcv / Image Bank PhotogenicaModel Release: NoCollection: Image Bank PhotogenicaKnown restrictions: » only non-exclusive licence is available » editorial use only Keywords for the item PHX836415998: infrastructurepoliticpoliticalpoliticsromaniapoliticianbucharestpsdconstruction siteunirii squareconcrete slabpublic administrationdambovita riversocial democratic partyreconstruction sitedaniel balutamayor of sector 4dambovita river roofplanseul uniriidambovita river slabThe content titled Bucharest, Romania. 28th Aug, 2025: Sector 4 Mayor Daniel Baluta speaks during a press conference about the reconstruction work on the concrete slab covering the Dambovita River in Unirii Square. Severely degraded, the 350-meter concrete slab partly can be purchased at the Photogenica image bank on the basis of the Royalty Free licence. All images, illustrations, vector files and motion clips can be downloaded immediately after the purchase (after completion of the payment). |
|
|
|
|